1 And it came to pass in the four hundred and eightieth year after the Bnei Yisroel were come out of Eretz Mitzrayim , in the fourth year of Sh'lomo's reign over Yisroel, in the month Ziv, which is the second month, that he began to build the Beis Hashem.
2 And the Beis [Hamikdash] which king Sh'lomo built for Hashem, the length thereof was threescore cubits, and the breadth thereof twenty cubits, and the height thereof thirty cubits.
3 And the Ulam (Portico) in front of the Heikhal of the Beis [Hamikdash], twenty cubits was the length thereof, according to the breadth of the Beis [Hamikdash]; and ten cubits was the breadth thereof projecting in front of the Beis [Hamikdash].
4 And for the Beis [Hamikdash] he made embrasures.
5 And against the wall of the Beis [Hamikdash] he built chambers round about, against the walls of the Beis [Hamikdash] round about, both of the Heikhal and of the Debir; and he made chambers round about;
6 The lowest story was five cubits broad, and the middle was six cubits broad, and the third was seven cubits broad; for without in the wall of the Beis [Hamikdash] he made narrow ledges round about, that the beams should not be fastened in the walls of the Beis [Hamikdash].
7 And the Beis [Hamikdash], when it was under construction, was built of stone made ready before it was brought there; so was neither hammer nor chisel nor any tool of iron heard in the Beis [Hamikdash], while it was under construction.